Chestnut Street After Repair |
|
 |
 |
|
|
HJ Eppel has been approved for $90K worth of asphalt patching around the city.
$10K for A-3 Spray patching was also approved for Midwest Asphalt Repair out of Eureka, IL.
The following locations will be worked on:
John St.: Centerline
Chestnut St.: Hazel St. to the east
Water & Forrest: Intersection
Timber & Forrest: Intersection
300 Block Timber: North edge of street
Forrest & Payson: Intersection
300 Block Payson: West end of Block
Dixie Lane Alley: Bad Asphalt removed, needs replaced
Dixie Land & Second: Intersection Holds Water
Bungalow Place: Repair Portions in North Half, Both Lanes
1400 Block S. Oak: Repair Bad Section
600, 700 Block Lincoln: Repair Bad Portions
Bob-O-Link: Subdivision Entrance Lanes, Bad Sections
Deerfield Rd. & 4H Park Rd: Install Wider Radius at Corner
4H Park Rd. (Twin Bridges): Repair Settling Pavement at Expansion Joints
400 Block Polk St: Overlay, City Crew will Repair Bad Curbs
A-3 Spray Patching: Patch A-3 as well as Asphalt Throughout Town
The repairs have been started and should be complete in two to three weeks.
A-3 patching has not been scheduled but will only take 2 days to complete.
Street closures will be limited with traffic allowed on the roadway within the day of work.
The other big project underway is Aurora Street. The storm sewer phase of the project is at 60% completion with the remainder of the work to be completed within three weeks. The actual street construction should begin shortly after that. The project is utilizing both Motor Fuel Tax (MFT) funds for the construction of the storm sewer and FAU (Federal Aid Urban) funding to construct the roadway. Stimulus funds that remained from the Deerfield Road overlay last fall will also be applied to this project. The road construction will consist of new curb and gutter, removal of the existing A-3 pavement and the installation of concrete pavement. The project will begin at Indiana Avenue and end at John Street. The project will require the complete closure of Aurora Street until the target completion of mid-November 2010. Through traffic will be diverted from the north to Main Street to access Indiana Avenue and the High School. No through traffic will be allowed on Aurora Street during construction.
|